Clients
![]() |
![]() |
![]() |
|
![]() |
|||
![]() |
|||
![]() |
![]() |
||
![]() |
|||
![]() |
![]() |
||
![]() |
![]() |
||
![]() |
|||
![]() |
|||
![]() |
|||
Client Testimonials
BHP Atwood Eagle Project
Safety Pusher
“Icon’s Construction Manager has been instrumental in setting a very high standard and it is a credit to you and your company.”
BHP Stybarrow Project
Sub Sea Engineer
“The whole planning and execution of this work scope‐ It was completed in a timely and professional manner with minimum involvement from BHPB – an excellent job all round.”
Chevron Yammaderry Skate Project
Drilling Manager
“I would like to express our thanks to ICON Engineering for the work scope completed in the support of the Yammaderry and Skate Recompletion Project. Chevron appreciates the extra effort ICON Engineering provided during the many scope changes and additional work requests. The last minute design and fabrication of the Jacking Support Frame and urgent engineering support provided by ICON over the Christmas period saved Chevron a large amount of time. We appreciated the level of attention ICON payed to promoting an incident free workplace. ICON’s detailed planning in support of this key area of the operation played an important part in maintaining a safe and efficient workplace. It has been a pleasure working with ICON Engineering and we look forward to doing so again in the near future.”
Ensco Flareboom Project
Rig Manager
“We will be looking at giving ICON preference in any future contract work on board based on your employees attitudes as well performance”
ExxonMobil
Senior Drilling Superintendent
“I would not hesitate in using or recommending your company for future work.”
Geo Subsea
General Manager Service Projects
“I would like to take this opportunity to thank you and your team at ICON for your professional cooperation, flexability and fast turn around of changing requirements and last minute issues (particularly over the Easter break).”
“Looking forward to working with ICON again.”
Origin
Operations Superintendent WA
“It is with some degree of pride that the team at Jingemia has successfully installed and run up the new Cummins V-12 tri-fuel engine for JP-003B. It will be loaded up to near full speed and pump flow with close monitoring by ICON and Origin, thus far running sweetly and expect it to remain so. The whole team need to be thanked.”
Ranhill Worley Sdn Bhd
MESC Contract Manager
Senior Project Manager
“Just a short note to thank you for your work here. Appreciate your help and the way you went about it without any fuss.”
Seastream JV Pyrenees Project
Project Engineer
“Agreed by all that the engineering work by ICON was superb – ICON should be proud of their accomplishments.”
Woodside Atwood Eagle Rig Modifications Project
Subsea Engineer
Rig Superintendent
“To support the Pluto offshore campaign, the Atwood Eagle MODU was contracted by Woodside. In order to safely and efficiently carryout the Subsea Operations for this campaign, a significant amount of modification work was required to be undertaken on the MODU. The Pluto Gas Project is Woodside’s premier project with both local and International exposure, the success of Woodside and of the Pluto project can in part be attributed to the highly dedicated nature of your engineers and the manner in which they conduct themselves. Throughout design, fabrication and installation and in particular during the offshore installation phase of the project, Icon consistently showed a professionalism and dedication to task completion well above what was expected by Woodside. Thank you.”
Woodside Enfield, ENC01-RD1 Project
Drilling Superintendent
“The Woodside Enfield Team, want to congratulate ICON Engineering, and their sub contractors for supporting us in the most professional and dedicated manner in supplying the Interface Structure for the Woodside Enfield, ENC01-RD1 well, it was quite an achievement. ICON completed this complex structure over a very tight schedule with no safety related incidents and within the budget, ICON worked well on this fast track project with Maersk, FMC and Woodside. ICONS “constant proactive support”, “uncompromised dedication” and professionalism is very much appreciated.”
Woodside IFS, Nan Hai6 Project
Drilling Superintendent
“Congratulations to ICON on completing such a fantastic achievement in such a tight time frame. Thanks to all the Icon team and the host of support engineering shops who have worked long hours on the Nan Hai teams behalf. The ICON teams personal approach and willingness to take on whatever is thrown at them makes the execution of a Superintendents responsibility so much easier.”
Woodside Pluto Tension Frame Project
“Thanks to the Organisation at ICON for making this happen for Woodside. Well done on completing this job, although there were some good challenges, ICON did come out of it in good shape. The equipment has been exposed in the field and function as designed when most needed, Keep up the good work.”
Woodside Laminaria & Corallina Development Project
Head of Drilling & Completions
“On behalf of the Laminaria Drilling & Completions team, I would like to ICON for providing the Heave Compensating equipment. ICONS ability to develop concept through detailed design, manufacture and more importantly offshore commissioning in such a short period of time was critical to meeting our tight offshore schedule. We would encourage you to promote this product. Once again, please pass on our thanks to all your personnel involved in this project.”
Woodside Torosa-5 Dump Valve External Plug Project
Well Delivery Manager
“Woodside called ICON when faced with the prospect of having to pull the SEDCO 703 LMRP to repair an inoperable riser dump valve. Within two days Icon had completed design, fabrication and delivery of an ROV installable external plug, which installed and operated flawlessly first time. We understand and appreciate that ICON Engineering and their fabricators worked around the clock to meet our tight schedule. This equipment made a huge cost saving in to the millions of dollars. Woodside places great emphasis on exceptional performance, Icons Project team deserve our thanks”
Woodside Nan Hai 6 – Coil Tubing Works Project
Drilling Superintendent
“Let me pass on the excellent feedback from the Nan Hai 6 offshore team, they are very impressed with ICON and the offshore installation of the coil tubing and other kit for the upcoming intervention. ICON crew was very well prepared, very well supervised, very efficient, Very flexible, ICONs Housekeeping was exemplary and all equipment installed works as designed This project could not have been ready for without ICONS involvement, A big well done and vote of thanks to all involved in this job.”















