Construction (General) – Onshore

Displaying Projects 1 - 5 of 6

ARC Energy Ltd
Dongara, Western Australia

Hovea Production Facility

ICON Engineering was commissioned by ARC Energy to perform engineering design and preparation of engineering documents such as process flow diagrams, P & I Ds, and multidiscipline design as well as project management, operating procedures, documentation for regulatory authorities, assistance with construction supervision and commissioning.

pdf

projects_hoveaproduction

ARC Energy Ltd
Dongara, Western Australia

Xyris Gas Plant Facility

ICON Engineering was commissioned by ARC Energy to perform detailed multidiscipline engineering design and construction management for the facility. ICON prepared all design deliverables including process flow diagrams and P&IDs.

The work included equipment procurement, construction and commissioning management, pipeline design & installation and operations support.

pdf

projects_xyrisgasplant

ARC Energy Ltd
Dongara, Western Australia

Xyris Area Gas Gathering System (XAGGS)

ICON Engineering was commissioned in late 2004 by ARC Energy to connect the Hovea, Apium and Xyris South fields to the Parmelia Pipeline.

ICON’s operations experience combined with project and controls know-how led to the delivery of the project on time and within budget.

pdf

projects_xyrisgasgathering

ARC Energy Ltd
Dongara, Western Australia

Pipelines and Flowlines

ICON Engineering provided engineering and management support to ARC for all these infield and export pipelines. Scope of work included project management, conceptual analysis, route determination, documentation for regulatory authorities, design validator liaison, pipe procurement, construction management and commissioning.

pdf

projects_dongarapipelines

Roller Skate Joint Development Project

Western Australian Petroleum Pty Ltd [now Chevron]

North West Self, Western Australia

ICON founders, Garrick Aberle and David Field were respectively the Project Manager and Designer / Senior Installation Engineer for this project. The development consists of 4 monopod platforms, two subsea pipelines and shore based oil separation and gas sales conditioning facilities.

The 26 km long, 3 phase, 26” diameter production line and 36 km long, 6” gas export line were constructed using the beach pulled / bottom tow method. At the time, this was one of the longest pipelines in the world constructed in this manner.

pdf

projects_rollerskate