Design – Detailed and / or Multidisciplinary

Displaying Projects 1 - 5 of 32

Woodside Energy – Enfield ENE 01

'Far Stream' Gravel Pack Operations

ICON was contracted by Woodside Energy Limited (WEL) to undertake the engineering design, detailing and installation of sea-fastenings for Schlumberger ‘gravel packing’ equipment on the 'Far Stream' AHTSV. This work was required as part of gravel packing operations on the Enfield Development on the North West Shelf, and was the first gravel pack conducted from a work vessel in Australian waters.

pdf

projects_farstream

Seastream JV – Pyrenees Field Development
North West Shelf – Western Australia

Design of Mid Water Arch & Gravity Bases

ICON Engineering was engaged by Seastream JV to design four (4) mid water arches (MWA) and gravity bases for operator BHP Billiton for the Pyrenees Development, in 200m of water. The design was specifically related to the in-service design, with key consideration given to installation method which required a single lift with maximum installation load of 700 Tonnes.

pdf

projects_seastream

AGR / EPPL / Premium Drilling Wilcraft
Modifications to Jackup for Subsea Completions

Timor Sea

ICON Engineering was engaged by AGR Asia Pacific to engineer modifications and produce procedures to enable high pressure 22” riser and subsea trees to be run from a jackup drilling rig. The rig was the Premium Drilling "Wilcraft", a Keppel Fels Mod V – Class B MODU.

pdf

projects_agrmodifications

ENI Australia Ltd – Black Tip Field Development

Offshore Platform Crane Installation

ICON Engineering was contracted by ENI to undertake the Project Management, Onshore trial assembly, Marine Transportation, Offshore Installation and Commissioning of the platform’s new crane, manufactured by Italgru of Italy.

pdf

projects_craneinstallation

PCPP / MMC Oil & Gas Engineering SDN. BHD.
D1 Cluster Development

Wellhead Support Frames (WHSF)

ICON Engineering was contracted by PCPP via MMC O&G to provide conceptual engineering and detailed structural design of two wellhead support frames (WHSF) at D30 and DANA fields that are part of the D1 cluster fields being developed by PCPP.

PCPP Joint Operating Company consists of Petronas Carigali, Pertamina and Petrovietnam and is undertaking the development of D1 cluster fields comprising of D30, Dana, Danau and Darma located offshore Sarawak, Malaysia.

pdf

projects_pcppwellhead