Skip to main content

Novel Two-Leg Tethering for Offshore Decommissioning: Beach Energy Otway

  • Equipment Solutions

Beach Energy’s Otway Basin decommissioning campaign called for a wellhead load-relief solution with no room for redundancy. ICON Engineering designed and deployed a first-of-its-kind two-leg Gravity Base Anchor tethering system, using standard AHTS vessels instead of costly construction vessels to handle the heavy subsea structures. The result was a reliable, reusable solution that extended wellhead fatigue life across two wells with full HSE compliance and zero safety incidents.

Download the full project case study to learn how ICON engineered a first-of-its-kind tethering configuration for the Otway field.

Project Details

Project Details

"*" indicates required fields

Unlock your offshore potential with our comprehensive engineering and project management services.

Our offshore services are designed to meet the unique challenges of the industry. We provide reliable, efficient, and innovative solutions that ensure project success.

Dan McVeigh

Project Manager & Business Development

Tim Maddern

International Business Development, Rig Mods & Equipment

Paul Steinmann

Business Line Manager, Offshore Equipment

Nathan Low

Regional Business Development Manager, ME&A