Beach Energy’s Otway Basin decommissioning campaign called for a wellhead load-relief solution with no room for redundancy. ICON Engineering designed and deployed a first-of-its-kind two-leg Gravity Base Anchor tethering system, using standard AHTS vessels instead of costly construction vessels to handle the heavy subsea structures. The result was a reliable, reusable solution that extended wellhead fatigue life across two wells with full HSE compliance and zero safety incidents.
Download the full project case study to learn how ICON engineered a first-of-its-kind tethering configuration for the Otway field.
Project Details
"*" indicates required fields