Booster Compressor Module Installation for INPEX Phase 2B

  • Brownfields

ICON Engineering executed the detailed engineering, marine transportation, and offshore installation of six Booster Compressor Module (BCM) Guides — totalling 220 tonnes — onto INPEX’s Ichthys CPF during cyclone season, with zero LTIs and zero spills.

Download the full project case study to see how ICON installed 220 tonnes of module guides for INPEX’s Ichthys Phase 2B project.