Skip to main content

Crane HPU Changeout on Santos’ Reindeer Platform

  • Brownfields

Crane HPU Changeout | Santos Reindeer Platform Santos engaged ICON Engineering to replace a critical crane hydraulic power unit on the Reindeer offshore platform, located in a congested, high-risk lower deck area near live pressurised well equipment. ICON developed a custom cable and support beam skidding system that allowed the crane to remain operable throughout the changeout, avoiding direct crane handling in the hazardous zone. The HPU was successfully removed and replaced in a live offshore environment, with minimal operational disruption and zero LTIs.

Download the full project case study to see how ICON executed a crane HPU changeout in a live offshore environment.

Project Details

Project Details

"*" indicates required fields

Unlock your offshore potential with our comprehensive engineering and project management services.

Our offshore services are designed to meet the unique challenges of the industry. We provide reliable, efficient, and innovative solutions that ensure project success.

Struan Gillies

Business Line Manager, Brownfields

John Rooney

Business Line Manager, Rig Modifications

Nathan Low

Regional Business Development Manager, ME&A