A repeat client engaged ICON Engineering to deliver a package of rig modification scopes on a jack-up rig preparing for a subsea development well in the Timor Sea. ICON’s engineered solutions minimised critical path exposure, introducing a novel modular platform design that replaced traditional multi-tier scaffolding around the BOP. The modifications enhanced the rig’s ability to handle subsea equipment, improving operational timings during HXT handling, recovery and deployment, delivered with zero HSEQ incidents.
Download the full project case study to see how ICON’s modular design improved subsea well execution in the Timor Sea.
Project Details
"*" indicates required fields