For the plug and abandonment of three wells in the Minerva field, Woodside Energy engaged ICON Engineering for a complete, turnkey Wellhead Load Relief solution — from geotechnical assessment and subsea tether design through to procurement, offshore operations support and installation. ICON’s asymmetrical field layouts and configurable Gravity Base Anchor ballast system addressed pre-existing wellhead fatigue and tight delivery timelines, enabling successful abandonment of all three wells with zero safety incidents.
Download the full project case study for the complete scope behind ICON’s turnkey delivery on the Minerva campaign.