Enquire now

Discuss your project requirements

So tell us...
What project is keeping you up at night?

ICON provides excellent engineering solutions. Complete this form and we'll get a problem solver on the case for you right away.

What services are you interested in?

Conventionally Piled Braced Monopod Wellhead Platforms

Advantages:

  • Suitable when seabed is too hard for suction piles

  • Installable with or without a crane barge

  • Bracing to CPP allows for monopod structure up to 60m WD (otherwise 20m)

  • Significant vertical load capacity

  • Negligible vertical load added to existing structure

Braced Monopod.jpg

2 Braced monopod conductors

 

Installation of the Wandoo B deck extension using pre-installed jackets.jpg

Installation of the Wandoo B deck extension using pre-installed jackets
return_to_top
© 2019 ICON Engineering
Powered by Kinetic.