Transport and Installation
-
Bird's eye view of the Jackup rig installation of a Wellhead Platform
-
-
-
Fast tracked air transport of a skid to PNG
-
The upending method from a transport barge is a lower cost of installation than using a higher cost heavy crane lift barge.
-
-
-
Lifting a skid for road and air transport
-
Barge towout of a SE Asian minimal WHP
One of the advantages of ICON’s independence from owning a fleet of vessels is that it can choose the optimal project execution for its client.
The best outcome for the client is the best outcome for ICON, and this entails determining the most effective way to install or develop an asset, whether that be by rig, barge or construction vessel.
Operators need to focus on mitigating Transport and Installation risks. Design platforms for installation by drilling rig where possible to reduce design, procurement, fabrication and overhead costs.
Pinpoint precision in the workshop and on the sea is essential when installing offshore structures. Pic from a recent ICON T&I project in SE Asia.