Skip to main content

Conductor Tensioning

CTU Model T230A

Overview

Conductor Tensioning Units (CTU) and Top Tensioning Systems (TTS).

ICON supplies conductor tensioning systems for jack-up drilling rigs, providing controlled axial loading during conductor installation and offshore drilling operations. These systems are used to manage conductor load transfer, alignment and stability throughout drilling and well construction activities.

ICON’s conductor tensioning equipment is widely deployed across offshore campaigns and has become a trusted solution for operators and rig owners. Systems are engineered for reliability, ease of operation and compatibility with existing rig infrastructure, supported by ICON’s offshore execution experience.

The conductor tensioning product range includes both push-type (CTU) and pull-type (TTS) systems, allowing selection of the most appropriate solution based on rig configuration, conductor size and operational requirements.

Key Features / Benefits

Conductor Tensioning: suits different jack-up rigs and conductor programs.

ICON’s conductor tensioning systems are available in a range of configurations to suit different jack-up rigs and conductor programs.

  • Controlled conductor loading

    Systems apply and maintain controlled axial tension, supporting conductor stability and load management during drilling operations.

  • Push and pull tensioning options

    ICON supplies both push-type Conductor Tensioning Units (CTU) and pull-type Top Tensioning Systems (TTS), allowing flexibility across different rig layouts and operating philosophies.

  • Integrated control systems

    Dedicated Conductor Tensioner Control Units (CTCU) provide precise tension control and monitoring throughout conductor installation and drilling activities.

  • Proven jack-up rig compatibility

    Systems are designed to integrate with common jack-up rig configurations and procedures, reducing installation and commissioning time.

  • Robust, field-proven equipment

    Equipment has been deployed extensively offshore, with designs refined through repeated use in demanding operating environments.

  • Conductor analysis and tensioning programmes

    Advanced design and analysis of conductor tensioning systems, including documentation of string loads at each stage of well construction, determination of minimum tension requirements to avoid compression buckling, recommended tensioning programmes, accumulator pre-charge specifications and vortex induced vibration (VIV) assessments. ICON’s in-house conductor analysis capability has assisted operators in safely achieving drilling results across multiple campaigns.

  • Experienced offshore support

    ICON provides offshore personnel and technical support to assist with mobilisation, commissioning and operation.

Technical Specifications

Available in a range of configurations to suit different jack-up rigs and conductor programs.

Contact ICON to discuss your project specific requirements.

Codes / Standards
  • API 8C, DNVGL-OS-E101, DNVGL-ST-0378, DNVGL-ST-E273
Certification
  • Independent certification by DNV / BV
Typical system elements
  • Conductor Tensioning Units (CTU), push-type systems
  • Top Tensioning Systems (TTS), pull-type systems
  • Conductor Tensioner Control Units (CTCU), dedicated tension control and monitoring
  • Push-type and pull-type conductor gripper clamps
  • Structural frames and load transfer assemblies
  • Hydraulic power and control interfaces
  • Monitoring and safety systems suitable for offshore use
Compatibility

Systems are compatible with a wide range of conductor sizes and rig layouts, with configurations selected to suit project-specific load cases and operational requirements. Customised configurations can also be provided to align with rig capabilities, operating procedures and certification requirements.

Projects

Explore our latest projects.

At ICON Engineering, we specialise in delivering comprehensive offshore solutions tailored to your needs. Trust our expertise to drive your projects forward with safety and efficiency.

View all
Chevron Wheatstone: ARTP E-Series Compensated Tension Lift Frame
  • Equipment Solutions

Chevron Wheatstone: ARTP E-Series Compensated Tension Lift Frame

Chevron Wheatstone: ARTP E-Series Compensated Tension Lift Frame

FAQs

Everything you need to know about conductor tensioning systems.

Unlock your offshore potential with our comprehensive engineering and project management services.

Our offshore services are designed to meet the unique challenges of the industry. We provide reliable, efficient, and innovative solutions that ensure project success.

McVeigh, Dan

Dan McVeigh

Project Manager & Business Development

Maddern, Tim

Tim Maddern

International Business Development, Rig Mods & Equipment

Steinmann, Paul

Paul Steinmann

Business Line Manager, Offshore Equipment

Low, Nathan

Nathan Low

Regional Business Development Manager