Skip to main content

News

  • News
  • 9 May 2016

Conductor Tensioner Units Win Repeat Gulf of Mexico Orders

Perth-based ICON Engineering has just chalked up another order of its conductor tensioner units (CTU) into the Gulf of Mexico’s (GoM) offshore oilfields, saying its well valued products are avoiding the drastic cost cuts in the drilling sector.

Conductor Tensioner Units Win Repeat Gulf of Mexico Orders
  • News
  • 9 May 2016

ICON meets with Foreign Minister at LNG18

ICON Engineering can report that Managing Director David Field and GM Equipment Steve Plain spent some quality time discussing matters of compensation with Foreign Minister Julie Bishop.

ICON meets with Foreign Minister at LNG18
  • News
  • 4 May 2016

Compensated Tension Lift Frame Proven in Offshore Trials

ICON Engineering has completed the successful offshore trial rig up of its latest Heave Compensated Tension Lift Frame (CTLF), which can be run as the primary compensator, or as back-up to the rig's drill string compensator to safeguard against unintentional lock-up.

Compensated Tension Lift Frame Proven in Offshore Trials
  • News
  • 13 May 2014

Coiled Tubing Lift Frames: ICON’s Proven 5-Model ARTP Range

ICON Engineering has announced the launch of the Advanced Riser Tension Protector (ARTP) Equipment Range, representing a significant advance in coiled tubing lift frames (CTLFs) for subsea well completions, well testing and well interventions.

Coiled Tubing Lift Frames: ICON’s Proven 5-Model ARTP Range
ICON's wellhead platform jacket for the HelM field, Gulf of Hammamet, Tunisia
  • News
  • 3 December 2013

ICON awarded HelM wellhead platform design and install offshore Tunisia

TOPIC S.A. of Tunisia has engaged ICON Engineering to assist in the development of the Halk el Menzel (HelM) field located in the Gulf of Hammamet.

ICON awarded HelM wellhead platform design and install offshore Tunisia
ICON Conductor Tensioner installed on the tension deck of a jack-up drilling rig
  • News
  • 17 September 2013

ICON cracks 20% of the jack-up rig market

Case Study — Originally published 17 September 2013 This article revisits ICON’s conductor tensioner design, one of the company’s most widely adopted pieces of drilling equipment, and has been updated...

ICON cracks 20% of the jack-up rig market
Boeing 747 Freighter loaded with drilling equipment for ICON Engineering charter flight
  • News
  • 11 July 2013

Drilling Equipment Transport: Revisiting ICON’s Urgent Charter Flight

In March this year, ICON transported 100 tonnes of specialist drilling equipment from Europe to Australia in less than 48 hours door-to-door, including ground freight and customs clearance both ends.

Drilling Equipment Transport: Revisiting ICON’s Urgent Charter Flight